BidScout

The Australian Government has already decided what a winning bid looks like.
We reverse-engineer it.

You know your business, your track record, and how you deliver for clients. We handle the rest: reading every document in the tender package, cross-referencing 140,000+ historical contracts, and building the compliance matrix so you can focus on telling your story. Federal, State, or panel.

AI Bid Accelerator — What You Actually Get

A real report from a real tender. This is what lands in your inbox.

RFT-11849: Mutitjulu Essential Services and Renewables Project. $20-50M. Director of National Parks. 11 addenda. Here's what our AI Bid Accelerator produced.

01

Every requirement mapped — including the ones buried in addenda

We cross-reference the RFT, every addendum, conditions of contract, and referenced standards. Requirements that aren't in the compliance matrix get found here.

Part 1Requirements Matrix
Reading this matrix: "Source" identifies the specific document and clause. "Maps to" shows which evaluation criterion the requirement affects.

Mandatory & Gate Requirements

#RequirementRisk
1WHS Accreditation Scheme (FSC or equivalent) — must hold at closingCRITICAL
2Mandatory site visit attendance — 14 January 2026CRITICAL
5Community Liaison Officer must be conversant in Pitjantjatjara and YankunytjatjaraCRITICAL

Requirements from Addenda (Not in Original RFT)

65-metre buffer from men's business site — solar array layout must demonstrate complianceCRITICAL
9Existing water main potentially contains asbestos cement — licensed removal requiredHIGH
10SCADA requirements unavailable — tenderer must state assumptions and manage design riskHIGH
This requirement came from Addendum 11 — not in the original RFT. Miss it, and your solar layout fails compliance.
Matrix Summary: 20 key requirements mapped. 5 gate requirements (miss any = disqualification). 6 requirements sourced from addenda not in the original compliance matrix.
02

Start with a draft, not a blank page

Section-by-section exemplar text structured exactly as evaluators expect. Add your company details where the [INSERT] markers are. The framing, structure, and evaluator alignment is done.

Part 2Exemplar Response Text: Service Delivery / Methodology
What Evaluators Are Looking For: Evidence that you understand both packages, have a credible delivery methodology, and can manage the cultural and environmental complexities.

1. Executive Overview

Exemplar Response Text

[INSERT: Your company/consortium name] is pleased to submit this tender for the Mutitjulu Essential Services and Renewables Project. Our team brings together [INSERT: Brief description of consortium structure] with demonstrated experience delivering essential services infrastructure and renewable energy systems in remote Indigenous communities across Northern Australia.

Cultural Partnership: Meaningful engagement with the Mutitjulu community and Traditional Owners is central to our delivery model. Our Community Liaison Officer, [INSERT: CLO name], is conversant in Pitjantjatjara and Yankunytjatjara and will be embedded in the project team from mobilisation through to handover.

Proven Remote Delivery Capability: Our team has delivered [INSERT: $X million] of infrastructure projects in remote Australian communities, including [INSERT: 2-3 comparable project names].

[INSERT] placeholders mark where your company details go. The structure, tone, and evaluator-aligned framing is done for you.
03

We find the landmines before you step on them

Requirements implied but not stated. Traps buried in addenda. Design risks placed on the bidder without clear notice. Every one mapped to what it means for your response.

Part 4Critical Intelligence

Hidden Requirements and Landmines

Requirements implied but not explicitly stated, or traps that many bidders miss.

1. Stantec Design Lock-In

Source: Contract CN3999232-A1 ($1.74M to Stantec for design)

Implication: You are constructing from Stantec's designs. Do not propose extensive design modifications — this signals you do not understand the procurement structure.

4. Asbestos in Water Mains

Source: Addendum 11 notes one existing water main is "thought to be asbestos cement."

Implication: Include asbestos inspection and handling in your methodology and pricing. Licensed removal required. Disposal must be off-site at licensed facility.

Buried in Addendum 11. Not in evaluation criteria. Not in compliance matrix. Miss this and your pricing is wrong.

5. Men's Business Site Buffer

Source: Addendum 11 requires 5-metre buffer from men's business site to north and east of Lot 303(A).

Implication: Your renewables site layout must demonstrate this buffer. Breach would have serious cultural and contractual consequences.

04

Pre-submission gate check

A printable checklist of every mandatory requirement, every evaluation criterion, every condition — verified for coverage. Know you're compliant before you submit.

Part 3Compliance Checklist
Automatic Disqualification Triggers: Miss any of these and your response is rejected before scoring.
Requirement
[ ]CRITICAL: WHS Accreditation Scheme
[ ]CRITICAL: Site Visit Attendance
[ ]CRITICAL: Non-Disclosure Deed Poll executed
[ ]CRITICAL: Both Package A AND Package B addressed
7 automatic disqualification triggers. A printable gate-check before you hit submit.

Attachment 3 Content Checklist

[  ]Electrical infrastructure — HV ring, substations, LV, telemetry

[  ]Water infrastructure — ring main, fire hydrants, temporary treatment

[  ]1MW solar array — 10 x 100kW modular, CEC approved

[  ]5m buffer from men's business site

Backed by 140,000+ contracts

Every report is grounded in historical procurement data

Award Patterns

Who wins from this agency, at what price points, and how often incumbents retain.

Evaluation Preferences

Whether this agency weights price, methodology, or experience — before you bid.

Pricing Benchmarks

Typical contract value, duration, and scope for similar work. Never price blind.

What the Data Shows

Most bids lose on compliance, not capability

4–7

Hidden requirements per tender

Buried in addenda, conditions of contract, and referenced standards — not in the evaluation criteria.

62%

Re-award to incumbents

Knowing this changes how you frame experience and risk in every section.

3.4×

Price range on similar work

Most bidders price blind. Our benchmarks show where the market actually sits.

Our Process

A structured pipeline, not a prompt

01Document Ingestion
02Addenda Reconciliation
03Requirements Extraction
04Requirements Matrix
05Historical Benchmarking
06Evaluator Lens
07Draft Generation
08Compliance Verification

Every report follows the same repeatable process — with guardrails at each stage. Every output traces to your tender documents.

Accuracy

No guessing. No generic AI output.

Document-grounded

Every output traces to specific clauses in your tender package.

Never fabricates

[INSERT] placeholders where your company details go. We don't make them up.

Your data stays yours

We don't store, train on, or share your documents.

Human-reviewed

Every report reviewed by someone who understands procurement.

Not sure if the Bid Accelerator is right for your tender?

Send us the ATM ID or tender link. We'll take a look, tell you what we can deliver, and give you an honest assessment — no obligation, no sales pitch.

Request a Free Tender Review

Free — Live Tender Feed

Same tender. Different intel.

AusTender gives you a paragraph. We extract evaluation weights, key requirements, mandatory criteria, and competition signals — from the actual RFT documents.

What AusTender shows you

EST10722: Swartz Barracks Stormwater and Civil Works, QLD

Department of Defence - DSRG$10.0M

Stormwater and civil works construction at Swartz Barracks, Queensland including design, construction, commissioning and handover

That's it. One paragraph. No evaluation criteria, no requirements, no intel.

What BidScout extracts — free

EST10722: Swartz Barracks Stormwater and Civil Works, QLD

Department of Defence - DSRG$10.0MIntel available

Evaluation Weights

Project Understanding50%
Program20%
Previous Performance15%
Workload & Resources15%

Key Requirements

— Site Management Plan

— Work Health and Safety Plan

— Aerodrome Method of Working Plan

— Commissioning and HOTO Management Plan

Mandatory Criteria

— Execute Tender Form

— Accept Contract without departure

— Lodge electronically before close

— Remain valid 90 days

Competition: Established civil construction company with Defence experience

$99/month

AusTender Smart Matching

Describe your business once. Our AI matches you to relevant tenders even when agencies use different terminology. Daily alerts, cancel anytime.

AusTender Feed — Closing Soon

View all

Stop guessing what evaluators want.

The government has already decided what a winning bid looks like. BidScout shows you exactly what that is — before you write a single word.